Supplier Development Assessments
Automotive
Aerospace
Cross-Sector Manufacturing
Human Resources Consultancy
Strategy Development
Strategy Deployment
Audit and Gap Assessments
Supplier Development
Total Productive Maintenance (TPM)
Quick Response Manufacturing (QRM)
Six Sigma
Process Improvement
Leadership Development Programme
Lean Transformation
NPI Technical Assessment
Automotive (NPLX)
Automotive Training
Aerospace Training
VDA QMC
Webinars
Virtual Learning (instructor led)
eLearning (self-directed study)
IATF
Core Tools
ISO
Lean Six Sigma
Leadership
Cross-Sector
APICS Certifications
AIAG Publications
IATF Publications
VDA Publications
BSI Publications
Publications Bundles
Our Partners
Our History
Our Clients
Careers at Industry Forum
SMMT & Membership
Electronics
Industrial Components
Industrial Products
Articles
Blogs
Case Studies
Insights
News
Resources
Assessments
Consultancy
Training
Publications & Standards
Home » Statistical Process Control (SPC) Training
Statistical Process Control, (SPC), is a method for gaining an understanding of the types of variation within a process and hence guide actions to either control or reduce this variation. It is used in many industrial sectors such as automotive, aerospace, renewable energy and mobile power generation.
1 day
SPC is module three of the Core Tools Certification. This module can be completed as a standalone course or part of the full Core Tools Certification Training. The full Core Tools Certification is achieved by completing all 5 modules of Core Tools Certification Training (APQP, Control Plan, FMEA, SPC, MSA and PPAP) and upon successful completion of the exam. Modules can either be taken as consecutive days (which can be booked here) or individually.
More information about the contents of each module and Industry Forum’s upcoming module dates can be found here:
Advanced Product Quality Planning (APQP) and Control Plan TrainingFailure Mode and Effects Analysis (FMEA) TrainingMeasurement Systems Analysis (MSA) TrainingProduction Part Approval Process (PPAP) Training
Please note: The statistical techniques used during the Measurement Systems Analysis course are covered in detail in our 1-day Statistical Process Control (SPC) programme. Therefore, we strongly recommend that you attend our SPC course before attending an MSA course unless you are already familiar with the statistical tools used.
This course is designed for Management Representatives, Implementation Teams, Internal Auditors and others who are involved in the auditing or implementation of Statistical Process Control (SPC).
Familiarity with basic statistical concepts would be beneficial but not necessary.
SPC can be used to understand the types of variation present within manufacturing process. By understanding the types of variation present actions can be taken either to eliminate the variation or reduce its impact. If the variation is excessive the process can be stopped to avoid making nonconforming product.
It is often mandated by automotive, aerospace and other engineering primary manufacturers as a specific requirement to support the management of critical product or process characteristics. Companies that apply SPC successfully, see improved product quality, on time delivery performance and reduction in the cost of non-quality.
Delegates will become competent in implementing, undertaking and auditing Statistical Process Control concepts including variable and attribute studies.
Upon completion of the course you will receive an Industry Forum certificate of attendance.
"*" indicates required fields
Industry Forum helps major global manufacturers understand, optimise and improve both manufacturing capability and business performance. Over 250 organisations in 30 countries trust Industry Forum to deliver and maintain sustainable improvement.
SMMT Industry Forum Ltd 2680 Kings Court The Crescent Birmingham Business Park Birmingham UK B37 7YE
+44 (0)121 717 6600
[email protected]
Seasons Greetings, Our offices will be closed from 24th December 2024 to 2 January 2025 Last publication orders will be dispatched on Thursday the 19th December, any orders received after the 19th will be dispatched on 2 January 2025. Dismiss