The last date for shipping publications orders before the Christmas period will be 18th December 2025. Any orders purchased after this date will be processed when our offices reopen on 5th January 2026
Industry Forum

Case Studies

Philips

Reducing costs through the application of Total Productive Maintenance   Background Philips Lighting Uden are part of Philips Electronics. The core business in Uden is […]

Read More…

Perkins Engines

A case study of increasing profitability through the development of a world-class supply chain. Background Perkins Engines at Stafford intended to support rapid growth in […]

Read More…

Owens Corning

Industry Forum is working with Owens Corning to roll out the tools and techniques of Total Productive Maintenance (TPM) across all of their plants to […]

Read More…

Leyland Trucks Ltd

Improving assembly processes through the application of lean manufacturing. Background Leyland Trucks manufactures the full range of DAF Trucks, from 7.5 to 44 tonnes, at […]

Read More…

Energ Group

A business process improvement programme resulting in a 60% reduction in lead times. Background ENER-G designs, develops and finances energy efficient, sustainable and renewable solutions […]

Read More…

Electrolux

Industry Forum worked with Electrolux to develop their global lean manufacturing programme, the Electrolux Manufacturing System (EMS).Currently, it is used throughout their global operations with […]

Read More…